Book chapter · CRC Press eBooks · September 11, 2023
Recommendations for the protection of an earthen embankment from flooding on the Big Almaty Ring Road (BAKAD)
Askar Zhussupbekov, Nazgul Aidargaliyeva, Assel Tulebekova, A.U. Yessentayev
Abstract
The problem of construction of the Big Almaty Ring Road (BAKAD) in conditions of the possibility of flooding by ground and external waters is considered. The hydrogeological conditions of this site and general constructive solutions of the embankments, according to the working project, were considered. When designing structures on these collapsible soils, one should consider the possibility of increasing their moisture content by soaking the soil from above from external water sources. Taking this into account, it is necessary to provide for a set of measures, including the elimination of subsidence properties. Having studied the experience of road construction in Kazakhstan, as well as the design data and geological conditions of the project “BAKAD”, as well as analyzing the results of laboratory soil studies and the results of field stamp tests. And regarding the test results was recommended constructive technological solution with using geosynthetics materials.
More by Askar Zhussupbekov
- Closure to “Impact of Gradation Effects on the Particle Breakage and Mechanical Response of Calcareous Sands”International Journal of Geomechanics · 2026
- Soil Arching Developed in Foundations of Unconnected Piles Under Seismic LoadingSoil Mechanics and Foundation Engineering · 2026
- Utilization of the Piezo Drive Cone: On-Site Investigation for Liquefaction Potential AnalysisSoil Mechanics and Foundation Engineering · 2026
- A Study on the Total Factor of Safety for Liquefaction Potential AssessmentSoil Mechanics and Foundation Engineering · 2026
