Practical testing of piles of modern complex in Kazakhstan
Askar Zhussupbekov, Gulshat Tleulenova, Atogali Jumabayev, Zhanbolat Anuarbekovich Shakhmov, A. Mukasheva, Zh. Utegulova
Abstract
This study evaluates the load-bearing capacity of pile foundations, with a focus on those used in the “Multifunctional complex”. The objective of the field tests was to determine the bearing capacity of two driven piles, Nos. TR7 and TR18, type C9.30, installed to depths ranging from 4.1 m to 3.5 m, with final shaft elevations of 340.51–341.34. In addition, one driven pile No. TR34, type C11.30, was installed to a depth of 3.6 m. Two test piles of grade C9.30 (TR7 and TR18) and one test pile of type C11.30 (TR34) were subjected to load testing. Driving operations were performed on July, 2021, using a Juntan PM-25 pile-driving rig equipped with an NNK-5A hydraulic hammer weighing 5000 kg. Field load testing was conducted after a pile “rest” period of 28 days following installation. The load-bearing capacity of the pile according to the results of static load tests on the above-mentioned site of construction amounted to 799 kN.
More by Askar Zhussupbekov
- Closure to “Impact of Gradation Effects on the Particle Breakage and Mechanical Response of Calcareous Sands”International Journal of Geomechanics · 2026
- Soil Arching Developed in Foundations of Unconnected Piles Under Seismic LoadingSoil Mechanics and Foundation Engineering · 2026
- Utilization of the Piezo Drive Cone: On-Site Investigation for Liquefaction Potential AnalysisSoil Mechanics and Foundation Engineering · 2026
- A Study on the Total Factor of Safety for Liquefaction Potential AssessmentSoil Mechanics and Foundation Engineering · 2026