The article considers the project a new railway station on problematical soils of Astana, as well as light rail LRT Project. This article includes a summary of dynamic and static tests of driven and bored piles. Also, it is given the methodology for determining the bearing capacity of piles. As an example of these methods, the results of the dynamic, static and new PDA (Pile Dynamic Analyzer) test of teamwork and piles of soil carried out on the construction site “The new railway station in Astana” and Project light railway LRT (Light Railway Transport) planned to build in time for the World Expo in Astana EXPO-2017. This paper presented a short description of changes to the concept of Kazakhstan pile foundation design and to use PDA and DLT and SLT pile load tests. By georadar survey was funded the areas which reported a hard rock at a depth of 16 meters and other soil layers.
More by Askar Zhussupbekov
- Closure to “Impact of Gradation Effects on the Particle Breakage and Mechanical Response of Calcareous Sands”International Journal of Geomechanics · 2026
- Soil Arching Developed in Foundations of Unconnected Piles Under Seismic LoadingSoil Mechanics and Foundation Engineering · 2026
- Utilization of the Piezo Drive Cone: On-Site Investigation for Liquefaction Potential AnalysisSoil Mechanics and Foundation Engineering · 2026
- A Study on the Total Factor of Safety for Liquefaction Potential AssessmentSoil Mechanics and Foundation Engineering · 2026