Skip to content
Publications

Article · Petroleum Science and Technology · June 15, 2009

Application of a Coupled Wellbore/Reservoir Simulator to Estimate Accumulated Liquid Phase in Gas Wells

Peyman Pourafshary, Augusto L. Podio, Kamy Sepehrnoori

Abstract

Knowledge of the phase distribution and liquid accumulation in gas wells is very important in determining the restrictions that may exist for the inflow from the formation. It is also critical to determine if the flow rate of a well is itself sufficient to remove the loaded liquid phase or if other techniques should be applied. In this article, we used a developed non-isothermal transient multiphase wellbore/reservoir simulator to model liquid accumulation in gas wells. The simulator can be used as a tool to predict the amount of loaded liquid as a function of well flow rate and to design new flow strings to remove accumulated liquid.

Reservoir Engineering and Simulation MethodsDrilling and Well EngineeringOil and Gas Production Techniquesfluid accumulationgas wellswellbore-reservoir coupling

More by Peyman Pourafshary